Ongoing project

ONGOING PROJECTS
S.NO. PROJECTS
1 Construction of VUP at Km 114/000, 134/000 & LVUP at Km 114/800, 129/490, 172/280 of NH-58 (Beawar-Gomti section) in the state of Rajasthan on EPC mode
2 KOTA-MTJ Section: Provision of 2-lane road over bridge (ROB) in lieu of LC No: 246(TVU = 66732) at km: 1214/10-12 between BTE-DUM stations in the section of ADEN-BTE.
3 Construction of 2 lane Railway Bridge in LIEU of LC No. 211 at Railway KM 1153/30-1154/2 at Gangapur city – Bayana section in between Fatehsinghpura – Dumariya Railway station on Delhi Mumbai railway line.
4 Construction of 02 Lane ROB (Road over Bridge on Existing Level Crossing) in lieu of LC No. 208 at Km 1149/00-02 between Hindaun City-Fateh Singhpura in Kota-Mathura Section in the State of Rajasthan.
5 Construction of 2 Lane ROB in lieu of Level Crossing no. 407B at Km 1205/6-8 on Jhansi-Gwalior section.
6 Design & Construction of RE Wall Work at project “Widening / Strengthening / Up-Gradation to Two Lane With Paved Shoulder from Existing chain age Km 207.700 (Design Ch 208+550) to Km 216.440 (Design Ch 216+890) [Sagwara Bypass] & From Existing Km 227.470 (Design Ch 227+900 To Km 244.080.
7 (Design Ch. 235+000) [Garhi Partapurbypass] Section of Nh-927a in the State of Rajasthan”.